Blue Gold Innovation Fund[edit | edit source]

The Blue Gold Innovation Fund (BGIF) was created as an instrument to accelerate the development process in the geographical area of the Blue Gold Program. It financed innovative approaches and new initiatives to socio-economic development. Innovations submitted to the BGIF were expected to contribute to the outcomes of the Blue Gold Program; The impact was expected to be mostly locally or regionally centred.

Briefing Materials
Ico sl-tb-cs.png
The following materials illustrate concepts, interventions, outcomes and lessons learnt, including through stories from community members.
Thematic brochures
Case studies


An original allocation of €4.4 million (ref Program Document, August 2012 - Section 5.2.5 pp 60/61) was made for “services providers under the Water Innovation Fund of approximately € 2.4 million and the Productive Sectors Innovation Fund of approximately € 2 million,” In the Technical Assistance (TA) contract (February 2013), this was adjusted to €2.4 million for the Water Innovation Fund and €1.9 million for the Productive Sectors Fund.

As one of the outcomes of the 2016 Blue Gold Annual Review Mission, internal transfers were made between budget heads of the TA contract which resulted in a reduction in the amount available to the Blue Gold Innovation Fund (BGIF) to a total of € 2.45 million. This was divided into two separate funds: Water Innovation Fund with a budget of € 1.4 million, and a Productive Sectors Fund with a budget of € 1.05 million (focusing on agricultural production and food security). From 8th December 2017, a separate Water Management Knowledge and Innovation Program[1] (WMKIP) with an action research fund of €1.4 million (approximately) to be disbursed over a three year period, was created under the jurisdiction of EKN, managed by Deltares, an independent institute for applied research in water, based in Delft, the Netherlands, in association with the Institute of Water Modelling (IWM). a Bangladeshi organisation which carries out research, planning and technology transfer related to water management projects. Other knowledge institutions in Bangladesh and the Netherlands were to be involved in the program, with the aim of strengthening their cooperation in applied research and innovation. WMKIP's overall objective was to make an “effective contribution to the medium- and long-term development goals for the southern coastal region, through tested and sustainable water management innovations, knowledge development and participatory action research.”

To support the WMKIP objective, four innovation themes were defined, focusing on the key challenges and opportunities in the southern coastal areas, and including one cross-cutting theme:

  • Theme 1: Drainage Improvement; addressing the key issue of waterlogging
  • Theme 2: Enhanced Operational Water Management and Monitoring; in support of more effective and efficient water management at polder level
  • Theme 3: River and Embankment Management and Protection; to develop solutions for river siltation and embankment erosion
  • Cross-cutting Theme: Participatory Water Management; aimed at fostering sustainable and equitable water management.

WMKIP's initial fast track projects carried forward initiatives started under the Blue Gold Program, including an action research project for pumped drainage in Polder 2, a typology for river management, the use of water apps to enhance operational water management, and the use of composite materials in regulator gates.

Evolution of the Fund[edit | edit source]

The Innovation Fund has been subject to a number of changes since its inception: in addition to a reduction in the budget allocation from € 4.4 million to € 2.45 million in early 2017, approaches to the procurement, design and implementation of BGIF projects evolved as a result of experience and external influences.

The general objective and approach were captured in the project document (28 February 2012) as follows:

The Program will promote the introduction and application of innovations, both technological as well as conceptual innovations, as long as they are of clear relevance for the beneficiaries of the Program and the concerned implementing agencies in Bangladesh. Such innovations can be found in other projects and organisations working in Bangladesh, but also specifically with Dutch knowledge institutions and private sector enterprises.[Notes 1] In order to facilitate the adoption of such innovations, resources are included in the Program to identify and test the relevance and effectiveness of these innovations and scale-up their application. For this purpose, both funding and expertise is required. The type of expertise needed depends mostly on the nature of the innovations identified and will be mobilised on a short-term basis. The necessary resources to allow the identification, testing and scaling-up of innovations can be drawn from funding for the specific purpose of innovation included in the budgets of each of the components.”

Roughly three distinct periods can be identified, where the focus and methods of the BGIF shifted significantly.

2013-2015: Setting up the BGIF, demand driven[edit | edit source]

In the Blue Gold Inception Report, a number of potential innovative technologies and approaches were identified, including:

  • Research results to maximise the use of available fresh water after the monsoon period (water storage and crop diversification)
  • Cage fishing
  • Rainwater harvesting through infiltration (managed aquifer recharge)
  • Saline tolerant rice varieties and other crops
  • Improved cropping system and technologies
  • Dealing with the siltation and erosion problems in water courses
  • Improved drainage by pumping, using renewable energy
  • Web based GIS/MIS
  • Use of geo data for information to farmers.

From 2013 to 2015, around nine feasibility studies and pilot projects were financed, based on un-solicited proposals.  

It quickly became evident that the objectives laid out in the Program Document were difficult to implement on the ground. In addition, adherence was required to European Union procurement rules and procedures - which inter alia limit the contract values for solicited proposals to around €133,000 and for un-solicited proposals to around €50,000.

Therefore, in order to guide prospective bidders for BGIF funds, a Procedures Manual[Notes 2] was prepared with background information on Blue Gold, the concept of the innovation fund, the scope and purpose of the two separate funds (for water management and productive sectors), outline procurement and contracting arrangements, descriptions for each of seven steps in the process from generating a proposal to its evaluation (using the “funnel” diagram, as shown in Figure 36.1), and the standardised format to be used for proposals and concept notes. Preparation of the manual started from around June 2015 and the first published version was issued in November 2015.

2015-2017: Aid for Trade, supply driven[edit | edit source]

The Aide Memoire of the BGP Mid Term Review of 2015 recommended that “the Dutch ‘Aid & Trade’ policy favours the creation of sustainable business links between the Dutch private sector and that in the partner countries. In that context, innovations that have a link to international markets, both in terms of Bangladesh products and in terms of engendering supply contracts or direct investment from the Netherlands to Bangladesh, would be most welcome”. Following the MTR recommendation, substantial efforts were made to attract Dutch companies to visit Bangladesh and see if their innovative approaches could be applied in the Blue Gold area.

The Mid-Term Review (MTR) emphasised that the BGIF should be aimed at realising the ‘Aid to Trade’ policy of EKN in Bangladesh, and recommended that BGIF should target a far more active involvement by Dutch enterprises - not only for the development of Dutch business in Bangladesh, but also for the opportunities for collaboration between the Netherlands and Bangladesh. The view of the MTR was that BGIF offered suitable opportunities for Netherlands-based enterprises operating in the fields of water management and agriculture and which were interested in expanding their operations to Bangladesh.

In order to communicate these opportunities to Small and Medium Enterprises (SMEs) in the Netherlands, BGIF entered into partnership with the Dutch Network Group (DNG) in March 2017. Together with DNG the Innovation Fund launched a marketing campaign, titled ‘Ondernemen in Bangladesh’ ('Doing business in Bangladesh'), using email, social media (LinkedIn, Twitter) and a website (www.oibd.nl) to target SMEs and entrepreneurs from the Netherlands. The campaign had three main objectives:

  • Create awareness amongst Dutch entrepreneurs in both the agriculture and water management sector, of the business opportunities that the Blue Gold Program area offers, and to motivate them to submit applications to the Blue Gold Innovation Fund.
  • Enlist the Dutch agriculture- and water management- entrepreneurs to an information program to nurture them.
  • Create engagement with the Dutch agriculture- and water management- entrepreneurs to enlist with the Blue Gold Program and inspire them to implement their business ideas in Bangladesh.

By mid-2018, this resulted in the campaign attracting 75 organisations interested to follow an online mini-course on Bangladesh and 17 organisations applying for a feasibility study under Blue Gold Program.

  • Unfortunately, the campaign did not result in any running feasibility or pilot projects under the Blue Gold Program. More detailed discussions on the practicalities caused some organisations to withdraw their plans and focus on other activities or countries; others had so little understanding of the local context that too much support from the TA team would be required or so many elements of the project design would need to be changed to make it a success.
  • Since most of the Dutch SMEs had a limited understanding of the local context and were poorly networked with local organisations, a proposal for an arranged visit by SMEs which included a visit to the Blue Gold area and matchmaking with local organisations was made. However, once the mission was confirmed 8 out of 10 organisations pulled out. It was concluded that Dutch organisations should be shortlisted from those with experience of working in remote underdeveloped areas, preferably in Bangladesh.

In summary, a number of barriers prevented NL companies from active involvement in BGIF:

  • For compliance with EU procurement rules, the value of unsolicited BGIF projects was limited to € 50,000, an amount considered by NL companies to be insufficient reward for the anticipated risks.
  • The (M)SMEs had little to no connection to local entrepreneurs and local field staff to help them implement the projects on the ground.
  • The Dutch (M)SMEs had little idea about local market conditions in Bangladesh.
  • IF Dutch entrepreneurs showed an interest in Bangladesh (markets), their first priority for market entry would not be the coastal zone where Blue Gold worked because of its remoteness (from Dhaka) and the difficult communications to and within the polders. Those with interest would be enterprises already involved in water/delta development in general (eg Wageningen University & Research (WUR), and MetaMeta).

From 2015 to 2017, BGIF attempted to attract investments based on innovative conceptual thinking from Bangladeshi and Dutch applicants. However, the perceived financial, implementation and market risks proved to be insurmountable barriers to Dutch (M)SMEs. As a result, only a relatively few Netherlands-based enterprises applied for BGIF funds in the period from 2015 to 2017.

2017-2020: Demand driven; consolidation, scale up  [edit | edit source]

The supply-driven approach that had characterised the previous phase, was gradually replaced by a demand-driven approach, where a mix of local Bangladeshi and foreign international NGOs and Dutch companies partnered up to implement locally relevant and feasible projects that added value to the Blue Gold Program objectives.

In order to generate interest and attract innovative ideas from Dutch and international companies and organisations a call for proposals was launched, where the project size was 2.7 times higher than the previous budget ceiling, to EUR 133,000. The applications to the Innovation Fund now followed two routes:

  1. Unsolicited proposals, which have a budget ceiling of €50,000 and focus on smaller interventions such as feasibility studies or pilots.
  2. Solicited proposals, which have a budget ceiling of up to €133,000 and are initiated by Blue Gold through an international call for proposals (tender), supported by a detailed ToR and a guideline document.

The demand-driven approach was further stimulated through the appointment, in July 2017, of two BGIF managers, both of whom had existing technical roles in the Blue Gold Program. They were thus able to better match Blue Gold interventions with BGIF proposals, and to guide applicants in the preparation of projects which were both relevant and delivered tangible benefits to Blue Gold communities. Working linkages between Blue Gold’s technical experts and the BGIF implementing team, helped to better target the communities involved with implementation.

Fund Management[edit | edit source]

Procedures Manual – Unsolicited Proposals[edit | edit source]

In order to guide those submitting unsolicited proposals, a Procedures Manual summarised the application process (Chapter 1), provided background information on Blue Gold (Chapter 2), explained the concept of the innovation fund, the scope and purpose of the two separate funds - for water management and productive sectors - (Chapter 3), described the seven steps in the process from generating a proposal to its evaluation (Chapter 4), gave the evaluation criteria (Chapter 5) and the standardised format to be used for proposals and concept notes (Chapter 6).

Preparation of the manual started from around June 2015 and the first published version was issued in November 2015. This early version of the manual was revised twice in December 2015 and in January and February 2016 (when it was issued as version 5). Thereafter, revisions were carried out a more regular intervals: October 2016, February 2017 and in May 2018 (the final and eighth revision).

Solicited Proposals[edit | edit source]

Two calls for invitations were issued for bidders to submit proposals in response to a call for proposals with a terms of reference (ToR).

First Call - Improved Information for Agriculture:  In June 2017, invitations were issued inviting concept notes to be submitted under the theme “improved information for agriculture[2]. These concept notes were received in August 2017, and the shortlisted organisations were invited in October 2017 to submit full proposals by end-November 2017. Nine proposals were evaluated[3], as a result of which the following contracts were awarded:

  • mPower Social Enterprise “Breed identification and digital cattle registry” (March 2018)
  • MetaMeta Communications “Accelerating horizontal learning in Bangladesh polders: ICT as a force multiplier” (May 2018)
  • International Maize and Wheat Improvement Centre (CIMMYT) for “Leveraging decision-making science to sustain climate- and market-smart mungbean advisories in Patuakhali’s polder communities” (August 2018).

Second Call – Water Hyacinth and Climate-Smart Adaptations: In 2018, invitations were issued for proposals for: (a) the removal of excessive water hyacinth; and (b) the implementation of climate smart adaptation of agri-technologies. After a first-round evaluation of the 38 applications received in July 2018, six organizations were invited to submit full proposals (two for climate smart adaptation agri-technologies and four for the removal of excessive water hyacinth).  Of the six full proposals received in September 2018, the evaluation committee met in October 2018 and recommended one proposal on climate smart adaptation agri-technologies and one on removal of excessive water hyacinth. As a result, the following contracts were awarded:

  • Practical Action for ‘Sustaining sack farming practices through agro-met services in coastal polder areas of Bangladesh’ (signed in December 2018)
  • Khulna University for the “Development of value- added products from water hyacinth to support alternative livelihoods and ecological resilience in coastal villages of southwest Bangladesh” (January 2019).

BGIF Management[edit | edit source]

A full-time manager was appointed in March 2015 to coordinate BGIF activities. On the resignation of this manager in July 2017, a part-time, joint management team was appointed from within the Blue Gold TA team – a short-term international and a full-time national consultant. From July 2017, a number of Blue Gold’s technical experts located in zonal offices became part of the team supervising the implementation of BGIF projects[Notes 3].

The overall fund management costs account for about 15.3% of the whole BGIF. Out of this 90% went to BGIF fund managers and 10% to Evaluation Committee expenses, and occasional expert judgement on unsolicited proposals.

This 15.3% does not include the time and expenses of ad-hoc inputs from regular BGP staff involved in project appraisal. In addition, the designated lead technical BGP advisors to individual BGIF projects were full time employed by BGP and therefore also didn’t require additional reimbursements from the Innovation Fund.

Figure 37.1 BGIF funds and fund management expenses 2013-2020

Notes[edit | edit source]

  1. In its new multi-annual plan for development cooperation, one of the strategies to be promoted is to broaden the number stakeholders in development cooperation, specifically to include Dutch knowledge centres and private sector enterprises
  2. Alongside the evolution of the BGIF, the Procedures Manual was revised on a number of occasions and issued in May 2018 in its final (and eighth) version, a copy of which is available in the File Library
  3. The benefits of the involvement of Blue Gold’s technical experts is described above

References[edit | edit source]

  1. "WMKIP Bangla Delta".
  2. BGIF Call for Proposals. Euroconsult Mott Macdonald.
  3. BGIF Evaluation Process. Euroconsult Mott Macdonald.

See more[edit | edit source]

Previous chapter:
Chapter 36: Environmental Due Diligence
Blue Gold Lessons Learnt Wiki
Section H: Innovation Fund
Next chapter:
Chapter 38: Overview of BGIF Projects


Section H: Innovation Fund
Chapter 37: Purpose, fund evolution and management Chapter 38: Overview of BGIF Projects Chapter 39: BGIF Lessons learnt
  1. Blue Gold Innovation Fund
  2. Evolution of the Fund
  3. Fund Management
  1. Project types and the innovation tunnel
  2. Projects in the Water Management Fund and Productive Sector Fund
  3. Fairs by GoB departments
  4. Annex 38.1 BGP Projects
Blue Gold Wiki
Executive summary: A Call for Action
Section A: Background and context Section B: Development Outcomes Section C: Water Infrastructure


Summary


Summary and Introduction


Summary

Section D: BGP Interventions: Participatory Water Management Section E: Agricultural Development Section F: Responsible Development: Inclusion and Sustainability


Summary



Summary


Summary

Section G: Project Management Section H: Innovation Fund Files and others


Summary


Summary