Summary of Works Contracted by Polder by BWDB Division
From Blue Gold Program Wiki
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
This page hosts a series of tables provide the quantity and amount of infrastructure works contracted for each polder by each of the six BWDB Division against the RDPP budget heads.
Presented contracted quantities and amounts are in BDT Lakh and as of March 2021.
Amounts are based on the following figures:
Work not yet awarded = vetted amount
Ongoing works = contract amount
Completed works = paid amount
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
35.620
658.17
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
34.850
610.36
4
Repair of Regulator/Sluice with gate (nos.)
9
60.96
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
5
872.21
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
10
101.28
10
Pump shed (nos.)
4
37.73
11
Low cost Bank Protection work (km)
LS
112.89
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
499
15.78
15
Flood damage repair / Breach Closing
LS
30.04
16
GoB O&M
LS
11.39
Total
2,654.04
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
6.4
132.23
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
50.84
913.75
4
Repair of Regulator/Sluice with gate (nos.)
10
123.94
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
-
-
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
1.87
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
750
15.21
15
Flood damage repair / Breach Closing
LS
62.05
16
GoB O&M
-
-
Total
1567.8
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
11.86
266.34
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
18.69
153.45
4
Repair of Regulator/Sluice with gate (nos.)
1
23.78
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
4
598.38
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
3
82.72
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
198
5.17
15
Flood damage repair / Breach Closing
LS
4.98
16
GoB O&M
LS
35.44
Total
1222.56
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
18.49
174.91
2
Retired Embankment (km)
1.47
272.7
3
Re-excavation of khals (km)
38.38
440.07
4
Repair of Regulator/Sluice with gate (nos.)
13
139.84
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
2
404.40
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
LS
78.85
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
399.6
9.42
15
Flood damage repair / Breach Closing
LS
47.40
16
GoB O&M
LS
122.37
Total
1811.49
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
-
-
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
27.48
336.34
4
Repair of Regulator/Sluice with gate (nos.)
5
55.38
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
-
-
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
3.5
43.93
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
350
7.9
15
Flood damage repair / Breach Closing
-
-
16
GoB O&M
-
-
Total
614.4
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
2.7
52.5
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
5.74
75.96
4
Repair of Regulator/Sluice with gate (nos.)
3
20.02
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
-
-
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
100
2.59
15
Flood damage repair / Breach Closing
-
-
16
GoB O&M
-
-
Total
170.07
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
-
-
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
14.05
152.43
4
Repair of Regulator/Sluice with gate (nos.)
9
111.97
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
-
-
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
3.6
28.07
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
350
7.9
15
Flood damage repair / Breach Closing
-
-
16
GoB O&M
-
-
Total
468.26
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
0.15
9.00
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
24.80
549.78
4
Repair of Regulator/Sluice with gate (nos.)
6
127.78
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
1
287.26
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
30.10
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
350
7.9
15
Flood damage repair / Breach Closing
LS
11.09
16
GoB O&M
LS
0.94
Total
1146.84
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
4.78
72.55
2
Retired Embankment (km)
0.55
19.73
3
Re-excavation of khals (km)
8.67
75.48
4
Repair of Regulator/Sluice with gate (nos.)
3
6.22
5
Repair of Inlets/Outlets (nos.)
5
61.86
6
Construction of Drainage Regulator/ Sluice (nos.)
-
-
7
Construction Drainage Outlet (nos.)
2
28.06
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
LS
32.62
12
Rehabilitation of Interior Dike (km)
0.47
33.4
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
200
4.71
15
Flood damage repair / Breach Closing
LS
60.51
16
GoB O&M
LS
28.85
Total
407.53
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
15.98
110.94
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
25.35
355.29
4
Repair of Regulator/Sluice with gate (nos.)
14
98.34
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
1
418.22
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
LS
70.72
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
400
9.43
15
Flood damage repair / Breach Closing
LS
43.05
16
GoB O&M
LS
19.95
Total
1210.96
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
15.49
377.26
2
Retired Embankment (km)
1.16
81.32
3
Re-excavation of khals (km)
29.74
321.73
4
Repair of Regulator/Sluice with gate (nos.)
5
75.39
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
2
434.10
7
Construction Drainage Outlet (nos.)
8
Construction of Irrigation Inlet (nos.)
1
26.53
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
200
4.72
15
Flood damage repair / Breach Closing
LS
8.14
16
GoB O&M
LS
19.33
Total
1428.39
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
14.79
258.07
2
Retired Embankment (km)
2.18
75.46
3
Re-excavation of khals (km)
24.95
321.37
4
Repair of Regulator/Sluice with gate (nos.)
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
3
559.48
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
5.19
91.28
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
200
4.71
15
Flood damage repair / Breach Closing
LS
89.76
16
GoB O&M
LS
77.29
Total
1628.4
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
29.65
371.50
2
Retired Embankment (km)
3.71
263.61
3
Re-excavation of khals (km)
26.19
255.78
4
Repair of Regulator/Sluice with gate (nos.)
4
57.17
5
Repair of Inlets/Outlets (nos.)
36
33.36
6
Construction of Drainage Regulator/ Sluice (nos.)
3
509.00
7
Construction Drainage Outlet (nos.)
4
382.37
8
Construction of Irrigation Inlet (nos.)
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
LS
2.76
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
556.32
15.69
15
Flood damage repair / Breach Closing
LS
29.24
16
GoB O&M
LS
35.38
Total
2062.86
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
16.47
172.85
2
Retired Embankment (km)
1.4
65.33
3
Re-excavation of khals (km)
41.06
588.01
4
Repair of Regulator/Sluice with gate (nos.)
5
71.63
5
Repair of Inlets/Outlets (nos.)
42
22.98
6
Construction of Drainage Regulator/ Sluice (nos.)
2
793.52
7
Construction Drainage Outlet (nos.)
2
148.48
8
Construction of Irrigation Inlet (nos.)
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
2.22
26.37
13
Closure/ Cross-bundh (km)
LS
20.58
14
Supply of Drain pipe (m)
556.32
15.69
15
Flood damage repair / Breach Closing
LS
56.25
16
GoB O&M
LS
34.09
Total
2170.81
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
32.8
210.18
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
43.93
553.77
4
Repair of Regulator/Sluice with gate (nos.)
17
160.21
5
Repair of Inlets/Outlets (nos.)
49
55.00
6
Construction of Drainage Regulator/ Sluice (nos.)
1
234.22
7
Construction Drainage Outlet (nos.)
2
175.25
8
Construction of Irrigation Inlet (nos.)
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
556.32
15.73
15
Flood damage repair / Breach Closing
LS
6.45
16
GoB O&M
LS
0.87
Total
1520.21
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
3.03
34.70
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
4.60
18.13
4
Repair of Regulator/Sluice with gate (nos.)
7
40.89
5
Repair of Inlets/Outlets (nos.)
42
19.70
6
Construction of Drainage Regulator/ Sluice (nos.)
-
-
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
201.3
5.69
15
Flood damage repair / Breach Closing
-
-
16
GoB O&M
-
-
Total
156.73
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
15.06
135.62
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
17.93
227.73
4
Repair of Regulator/Sluice with gate (nos.)
12
255.45
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
1
514.14
7
Construction Drainage Outlet (nos.)
1
111.45
8
Construction of Irrigation Inlet (nos.)
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
6
119.97
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
556.32
15.73
15
Flood damage repair / Breach Closing
LS
6.54
16
GoB O&M
LS
38.47
Total
1592.78
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
17.76
154.17
2
Retired Embankment (km)
4.66
85.28
3
Re-excavation of khals (km)
19.4
208.81
4
Repair of Regulator/Sluice with gate (nos.)
7
147.03
5
Repair of Inlets/Outlets (nos.)
-
-
6
Construction of Drainage Regulator/ Sluice (nos.)
1
235.68
7
Construction Drainage Outlet (nos.)
1
138.34
8
Construction of Irrigation Inlet (nos.)
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
556.32
15.72
15
Flood damage repair / Breach Closing
LS
76.23
16
GoB O&M
LS
13.07
Total
1249.31
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
18.42
216.79
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
15.88
166.61
4
Repair of Regulator/Sluice with gate (nos.)
5
32.22
5
Repair of Inlets/Outlets (nos.)
16
13.95
6
Construction of Drainage Regulator/ Sluice (nos.)
-
-
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
500
11.6
15
Flood damage repair / Breach Closing
-
-
16
GoB O&M
-
-
Total
504.37
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
33.00
199.27
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
22.31
275.16
4
Repair of Regulator/Sluice with gate (nos.)
16
94.07
5
Repair of Inlets/Outlets (nos.)
41
65.68
6
Construction of Drainage Regulator/ Sluice (nos.)
2
418.57
7
Construction Drainage Outlet (nos.)
4
209.39
8
Construction of Irrigation Inlet (nos.)
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
500
11.60
15
Flood damage repair / Breach Closing
LS
43.61
16
GoB O&M
-
-
Total
1425.87
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
14.86
191.03
2
Retired Embankment (km)
-
-
3
Re-excavation of khals (km)
12.57
207.64
4
Repair of Regulator/Sluice with gate (nos.)
8
182.26
5
Repair of Inlets/Outlets (nos.)
3
1.61
6
Construction of Drainage Regulator/ Sluice (nos.)
1
250.47
7
Construction Drainage Outlet (nos.)
-
-
8
Construction of Irrigation Inlet (nos.)
-
-
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
-
-
12
Rehabilitation of Interior Dike (km)
-
-
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
500
14.88
15
Flood damage repair / Breach Closing
-
-
16
GoB O&M
LS
14.29
Total
969
SI. No
Work Items
Quantity
Amount
1
Re-sectioning of Embankment (km)
22.85
393.74
2
Retired Embankment (km)
5.45
210.85
3
Re-excavation of khals (km)
37.6
690.10
4
Repair of Regulator/Sluice with gate (nos.)
23
651.84
5
Repair of Inlets/Outlets (nos.)
1
3.00
6
Construction of Drainage Regulator/ Sluice (nos.)
2
481.52
7
Construction Drainage Outlet (nos.)
3
271.58
8
Construction of Irrigation Inlet (nos.)
9
Construction of culvert (nos.)
-
-
10
Pump shed (nos.)
-
-
11
Low cost Bank Protection work (km)
LS
55.72
12
Rehabilitation of Interior Dike (km)
27.15
13
Closure/ Cross-bundh (km)
-
-
14
Supply of Drain pipe (m)
500
14.88
15
Flood damage repair / Breach Closing
LS
172.57
16
GoB O&M
LS
69.94
Total
3403.82